Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5

KUKA KL4000 request

#2
嗨,汤姆,

我创建了线性铁路为客户me times ago. As I don't physically have access to the rail, I built it using the user manual but I was not able to test it and the client never told me if it was "OK".

Things to verify:
- Position and orientation of the rail base
- Position and orientation of the moving part center point
- Sense of the positive/negative movement
- Rail limits

Jeremy


Attached Files
.zip KUKA KL 4000.zip(Size: 76.47 KB / Downloads: 304)


Messages In This Thread
KUKA KL4000 request - byzet-jaro- 06-25-2020, 11:21 AM
RE: KUKA KL4000 request - byJeremy- 06-26-2020, 12:46 PM
RE: KUKA KL4000 request - byzet-jaro- 06-28-2020, 09:48 AM



Users browsing this thread:
1 Guest(s)